2016年12月1日星期四

What should be noticed when using Beizhu PP Formwork Panel first time?

Have you ever used the Beizhu plastic formwork panel? There many ponits that we need to follow in the construction.The following are highlights of machinery construction and safe operation:

1. Please use the tungsten steel blade with more than 80 stitches when PP formwork panel cut.

2. The space between the wooden beams to a column must not be more than 100mm; The distance between the wooden beams to a shear wall should not be greater than 130 mm; The distance between the wooden beams for a roof should be no more than 200mm.


3.Please avoid peak heat if they match the shape. And after the release of mold action it is better.

4. When matching the form of column, beam and balcony, please use the package printing process.

5.Please place PP formwork panel as flat as plywood formwork panel prevent deformation after release of the form.

6.Construction 6.Please have trained your employees if you use PP formwork panel for the first time. This is an essential ingredient.

7.We have the panel with or without flame retardant PP formwork. And the price is different.

More information about  Beizhu PP formwork panel, please contact below: 
Email: Beizhu05@beizhugroup.com
Whatsapp: 0086 13453145207

Is Plastic Formwork Panel really Expensive?



We all know that plastic formwork panel has so much advantages over other traditional formwork panel, like the feature of waterproof, no need of releasing agent, and so on. Then, as for the plastic formwork panel price, is it still competitive?


After researching, we find plastic formwork panel price is cheaper and more competitive than other traditional formwork panel.

Formwork panel price comparison analysis:
 Item
Specification
Market Price/PC
Residual recovery
Reusable Times
 Price/ SQM/time
Illustration
Bamboo Plywood
0.915M*1.83M*15MM
USD7.6-10.6
No
6-9
USD 0.6-0.8

Wood Plywood
0.915M*1.83M*15MM
USD4.5-7.6
No
4-6
USD 0.5-0.9

Plastic formwork panel
0.915M*1.83M*15MM
USD22.7
22.7×50%=
11.4(USD)
Over 60
USD 0.11
Minus Residual recovery


As above table shows, the plastic formwork panel price is only 1/5 of wood plywood price.

For more information about formwork panel price, please contact below:
Email:Beizhu05@beizhugroup.com
Whatsapp: 0086 13453145207

How to Test the PP Concrete Formwork Panel?

Easy test-Detect PP formwork panel of power concrete

1.Test the PP concrete formwork panel to deform and in wave paving:
Place the concrete slab PP sample in hot water of 70 degrees for five minutes. Then remove it and separate by hand. View the sample of the PP concrete formwork soften. It would be useless if it is soft.


2.Test if PP concrete formwork panel enthusiasm when nails to beat and collapse the formwork to remove:
Place the sample PP concrete formwork panel in the refrigerator of -10 degrees for 24 hours. Then remove it and leave the nails instead of 10 mm from the edge of the sample. See the sample break PP concrete formwork panel. It would be useless break.



We recommend not to put the sample of the PP concrete formwork panel can not reach beyond the inspection requirement.
More Information please contact me: Beizhu05@beizhugroup.com
Whatsapp: 0086 13453145207

2016年11月30日星期三

What is the optimal Formwork Panel?

Nowadays there are different kinds of formwork panels used in the concrete shuttering working. But the optimal formwork panel should be the film faced plywood.

As the development of the construction industry, the demand of the building materials especially the formwork panel like film faced plywood have been increasing. China, the biggest exporting country of plywood, its film faced plywood has been accepted well by more and more users from all over the world.



In north of China, especially the area of concentrated area of the wooden panels, the goverment increase the intensity of enviromental protection. All the factories that produced the wooden panel including the film faced plywoodmarine plywood, theother formwork plywood like LVL etc. are required to use the natural gas to burning the boiler to instead of the coal.

That means the cost of the film faced plywood will be climbing higher because the pricey of the natural gas.

So more and more small family mill are facing the closing because they are loosing the superiority of the price.


So if the buyers who are in the process of purchasingthe film faced plywood to use in the concrete formwork panel, they are strongly suggested to buy in the recent period because the market of stock film faced plywood are on sales. The price will only keep the same level for less than two months. Later the price have to be added 27 to 36 because of the cost problem of the natural gas.
  
More information please contact me: Beizhu05@beizhugroup.com
Whatsapp: 0086 13453145207.

Do you still use the PVC Formwork Panels?

With the economic development, rapid population growth, the global construction industry is growing faster and faster, the choice of building materials is particularly important. In the past, the common building formworks panel is PVC material, with the technology and production process improvement, the new plastic formworks panel came into being. For the world's builders, are you still using pvc building formworks panel?

Let us look at the following comparison results, I believe you will have a choice to change.


1.PVC formworks panel surface is smooth, the appearance is very beautiful. However, after several times use, the ordinary can only use for  4-5 times, 7 times for a good quality pvc plate, then its surface will become very rough and you have to use the release agent.



2.Pvc formworks panel is very heavy, the same size 1220 * 2440 * 18mm is 32kg, our plastic formwork panel is only 25kg. This is also what the customers value, for it is suitable for high-altitude operations and workers operation.

3.Pvc formworks panel is brittle, will easily broken when falling from the high-altitude. When the workers split the mold pry easily broken. And at the site, there will be a lot of debris on the ground, workers dismantling the formworks panel, usually throw down, so pvc formworks panel will easily break. While our pp board is intact.

4.Pvc formworks panel, 1cm from the edge can not nail, is easy to break. Our pp formworks panel only need to keep a distance of 2mm to nail.


5.Pvc formworks panel has layer of wood chips in the middle, or wheat straw, not waterproof. At the same time contains a blowing agent, the density is small, easy to absorb water.

6.Pvc easy to weathering.

7.PP formworks panel can be recycled, environmentally friendly.

8. Before we produced also pvc formworks panel, but the engineers and customers' feedback is not good. this time can be a few generations of formworks panels to show the history of the customer.

More information please contact me:Beizhu05@beizhugroup.com
Whatsapp: 0086 13453145207

2016年10月24日星期一

How To Operate your Construction with Formwork Planels?

1.When the hollow building template is used on the intersecting surface , it can be 14 mm thick, when used for transverse shear wall it should be 14 ~ 15 mm thick.

2. The distance between wood: (1) on the surface of the intersection wood square distance according to the thickness of the slab concrete, in general, if the thickness of slab concrete is less than 0.15 m ,the wood square distance  should be 250 ~ 300 mm.(2) the distance between wood of  the shear wall is adjusted by the height and thickness of the wall, for example, the wall is 2800 mm high and  300 mm thick, wood square distance should be 100 ~ 200 mm using a 14 mm thickness template, and be 150 ~ 250 mm with 15 mm thick planks of wood, if the shear wall, width of the pillar is thick more than 1 m, must add the fixed frame.

3. Between formwork panels is normally should no space, but if the temperature difference is 5 ~ 10 ℃, then should reserve 1 ~ 2 mm gap.

4. There shouldn't be gaps between the die shear wall and column puzzle, there must be wood square in internal Angle (the bottom of the wall) beam to insure the beam frame, wall and templates connect well. Shear wall formwork panels must be assembled into the whole piece before lifting, and then spread tablet, thus can reduce labor intensity, as well as improve the forming effect .

5. When nailing the formwork panels, the distance between the template edge and nail should be 15 ~ 30 mm, the strength of driving nail should be moderate, length of nails should be 30 ~ 35 mm, not too long or too short.

6.There must be a seam allowance for the wood in the beam bottom,make the wallboard stand on seam allowance of wood square, thus can ensure the leak leak not slurry and save wallboard material efficiently.

Testing Report
The testing is done under the following parameters:
1. Capability of material to last up to 60 times usage.
2. Flexibility and strength of materials
3. Heat resistance
4. deformation
5. water and moisture resistance
6. pull off capacity

If you have any questions or interest in our product, please call me at 
8613453145207. You can also email to Beizhu05@beizhugroup.com.

2016年10月23日星期日

Comparison of Metal and Plastic Formwork Panels

In the large construction market we can see many kinds of formwork panels. They are made by different materials, such as metal, hollow plastic, common plastic, steel, bamboo, playwood and so on.

Today i will show the difference between our Beizhu Hollow plastic formwork panels with metal formwork panel. See as follows:

1.The price of metal formwork is much higher than plastic formwork panels.

2.Because of the heavy weight of the metal formwork panels, the builder need to rent cranes and other equipment. The rent fee is also a big cost.


3.Because of the heavy weight of the metal formwork panels, the labor cost is higher, the speed of installation and speed of demoulding is slow.

4.The metal formwork panels must be used in High - rise building, in order to reduce the use of costs. If the floor number of the building is less than 30,we do not suggest to choose metal formwork panels.

5.Because of the re-usability, if use PP hollow plastic formwork to construct 30-storey high-rise, just need to purchase formwork panels for 3 storeys. 

6.When use aluminum alloy formwork panels, the structural drawings and construction drawings must be very accurate, and need to design the size of formwork panels in advance, otherwise the size of formwork panels can not suitable for the project.

7.When using aluminum formwork ,size can not be modified, but plastic formwork can be cut according to the requirements.




8. One-time investment of metal formwork is high, very expensive.

9.After using, the surface of concrete and aluminum had a chemical reaction, the concrete surface is smooth, but there will be some small bubbles.

10. Because there is no corrosion resistance, so the aluminum formwork panels cannot be used on construction basement.

For more information about retro cast iron radiator, please call me at:+ 86134 5314 5207.You can also email your request to Beizhu05@beizhugroup.com.

What is Formwork Panel?

Formwork Panel is a die or a mould which used to shape and support the concrete until it attains sufficient strength to carry its own weight, including all supporting structures. It should be capable of carrying all imposed dead and live loads apart from its own weight.

Introduction to formwork panel
 Since the beginning of concrete construction formwork panel has been in use.
 There are nay new materials such as plastics, steel, and fiberglass are used in formwork panel.
 Man has pay greater attention to the erection, fabrication, design, and dismantling of formwork panel.




Defenition:
 1. As a structure
 2. Form it into the required shape and dimensions.
 3. Temporary which is designed to contain fresh fluid concrete.
 4. Support it until it cures sufficiently to become self supporting.


The term ‘formwork panel includes the actual material contact with the concrete, known as form face, and all the necessary associated supporting structure.

For more information about retro cast iron radiator, please call me at:+ 86134 5314 5207.You can also email your request to Beizhu05@beizhugroup.com.

2016年10月22日星期六

Why our Formwork Panel has such Big Market? (2)

Beizhu group is the most advanced plastic formwork panel manufacturer in China.We developed and manufactured plastic formwork since 2008.

The new material formwork panel has many advantages:

To be continue.

7. Waste products can be recycled and reprocessed, making full use of waste materials, This property can greatly reduce the project cost, compared with wooden formworks  and bamboo formworks.

8. Environmental protection and energy saving, no pollution. Without any poisonous or harmful gas.

9.Demoulding easily. No need brushing release agent, only tapping, the formwork panels will fall off. Shorten working hours and speed up the construction schedule efficiently.

10. Easy to process. Sawing, drilling and nailing are all available. Formwork panels can be combined vertically and horizontally optionally


11. Easy to remove. Removing is convenient, quick and safe, and the supporting is also easy to operate, advantageous to the organization construction, effectively improving the construction schedule. Save cost up to 50%.

For more information about formwork panels, please call me at:+ 86134 5314 5207.You can also email your request to Beizhu05@beizhugroup.com.

Why our Formwork Panel has such a Big Market? (1)

Beizhu group is the most advanced plastic formwork panel manufacturer in China.We developed and manufactured plastic formwork since 2008.

The new material formwork panel has many advantages:

1.Light weight, high strength, high hardness, impact resistance, wear resistance.

2. Surface is smooth, bright and clean; Casting molding effect is good.








3.No absorption of moisture, no deformation, no mildew; Long-term immersion stratification in the water, no bubbles, sheet size stability, especially suitable for underground and damp environment.

4. Good toughness. Can be used to make other different shapes and size formwork panels.

5. Acid and alkali resistance, corrosion resistance; Very suitable for the engineering application in coastal areas, mine, as well as seawall. It is need not do any preservative treatment both in using and storing the formwork panels, which do not pollute the concrete surface.



6. The times of reuse can reach more than 60 times,even80-100 times, long service life.

For more information about our formwok panels, please call me at:+ 86134 5314 5207.You can also email your request to Beizhu05@beizhugroup.com.